Display Mode
Section 3
Container Charges Against Applicants
………………………………………
 
301 Container Loading or Discharging Charge
                Charges are for the use of berth for discharging inward container from vessel and loading onto vehicle for taking out of the port area or for unloading outward container which is entered the port area from vehicle and loading onto vessel. The charges
shall be collected according to the status of container at the following rates:-0
                                                                                                           Baht/Box
                                                                                                  20´         40´         >40´
                301.1      Laden container                                        300         485         570
                301.2      Empty container                                        150         240         280
                As for Inward LCL container discharging from vessel for unstuffing and loading cargo onto vehicle for taking out of the port area or storing cargo in the storage area and then loading empty container onto vessel, the container wharfage charge shall be collected as specified in item 301.2.
 
302 Container Storage Charge
                Inward container which is discharged from vessel and is not taken out of the port area or outward container which is entered the port area for loading onto vessel is granted the free storage period of 7 days following the complete day of discharging or the entering day as the case may be.
                Empty container which changes its status from inward LCL container, charge will be assessed commencing from the day of unstuffing of such container unless such container is still in the free storage period. After the exemption period, charge will be collected daily at the following rates:
                                                                                                           Baht/Box/Day
                                                                                                     Storage Period (Day)
                302.1      Laden container (FCL or LCL container)   1-7          8-14        15&Over
                                (1)  20´ Container                                     150          265         380
                                (2)  40´ Container                                      300         530         760
                                (3)  over 40´ Container                              340         595         850
 
 
                                                                                                           Baht/Box/Day
                                                                                                     Storage Period (Day)
                302.1      Empty container                                        1-7          8-14      15&Over
                                (1)  20´ Container                                      25          50         100
                                (2)  40´ Container                                      50         100         200
                                (3)  over 40´ Container                              60         120         240
                                As for oversized inward and outward container storage, additional charges in excess of 50% above the prescribed rate shall be applied.
 
303 Facilities Usage Fee
                Charges for the use of space and facilities for unstuffing inward container or stuffing outward container shall be collected at the rate         100         Baht/Box
 
304 Reefer Container Service Charge
                Charges for the use of facilities and electricity for reefer container shall be collected at the following rates:
                                                                                                           Baht/Box
                                                                                                  20´         40´         >40´
                                                                                                 215         350         405
 
          304.1 Pre-Trip Inspection
                The use of electricity more than 3 hours will be taken as one day as specified in item 304.2.
 
          304.2 Electricity Supply
                                                                                                           Baht/Box
                                                                                                  20´         40´         >40´
                                                                                                 430         700         810